dam up
英 [dæm ʌp]
美 [dæm ʌp]
壅高;筑坝壅水;挡水
英英释义
verb
- obstruct with, or as if with, a dam
- dam the gorges of the Yangtse River
双语例句
- A typical mud-gravel structure can be seen at the Shuiqiuchi Pool dam, it was piled up by debris flow deposits, and its formation is not related to mountain falling.
水湫池堰塞坝的沉积物具有典型的“泥砾”结构,在形态特征上属于粘性重力流的碎屑流堆积; - The analysis of planting trees to the different discharge in same base slopes at the same time mean velocity in section before and after explained vegetation dam can let up average current velocity in front and inside of dam, and turn the current velocity peak value even.
同时通过对相同底坡不同流量下植树前后断面平均流速的分析,说明了植物坝能较好的减小坝前和坝内的水流平均流速,并将流速峰值均匀化。 - In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up.
本文主要通过坝基现场抽水试验试验资料整理,在揭示黄土坝基降水特性规律的基础上,确定可以反映现场抽水条件的的实用降水计算模型和参数; - Along with the development of the West Regions, West-East electricity transmission project, South-to-North Water Transfer project are under way, there are more and more constructions of high dam and giant reservoir coming up.
随着西部大开发、西电东送以及南水北调等国家级大工程项目的开工建设,高坝大库的建设越来越多。 - Whatever happens, you have to dam up your feelings.
无论发生什么,你必须控制住感情。 - Jack is not such a man as can dam up his feeling.
杰克不是能控制感情的人。 - By applying static hydrodynamics law to analyze the rubber dam, a static two-dimensional model of rubber dam without outflow was set up.
通过流体静力学规律对橡胶坝进行分析,建立了无溢流情况下橡胶坝的静态二维模型。 - Therefore, protective measures for preventing tailing dam breach should be taken from the respects of improving the design of flood control ability, strengthening the stability of the dam and tightening up the management.
因此,预防溃坝的环境风险防护措施,要从防洪设计、增强坝体稳定性及加强管理等方面进行。 - Thirdly, the framework of early-warning system for ill reservoir dam is set up with the Web GIS technology. Based on the above, the classification and the selection and the principle of the early warning index is studied, including the developing method for the index system.
构建了基于WebGIS的病险水库大坝预警系统架构,在此基础上,研究了预警指标的分类、预警指标筛选的条件和原则以及指标体系的构建方法。 - The problem of uplift pressure being higher in non-overflow sections at the right bank of Shiquan dam has come up since the first dam safety inspection, a lot of studies and work have been done but got lower effect.
石泉大坝右岸非溢流坝段扬压力超标问题自第一次安全定期检查提出后,曾做过大量的加固研究工作,但效果一直不明显。
